Efficient, Rapid and Powerful Calculation/Optimization
Engine
The complexity of creating and monitoring
an optimized schedule correlates with the amount of resources and
activities involved, and with the degree of complexity of constraints
on the activities. Capable of managing in a few minutes thousands
of tasks assigned to thousands of resources, ADE Enterprise has
proven its extraordinary calculation capacity on complex projects.
- Several calculating
engines that can be installed on several servers
- Automatic Scheduling
Component: " Scheduler"
- Optimization Component (cost reduction,
resource utilization optimization, etc.) "Optimizer"
- Manual and/or automatic
scheduling
- Possibility to pause
or interrupt and resume the calculation
- Calculation starting
from existing schedule or starting fresh
- Partial calculation
(on a subset of resources and/or a designated time period)
- Iterative schedule
construction
- Automatic allocation
of rooms, trainers, equipment, etc.
- Saving best schedules
constructed, to serve as references in future schedule development
- Consideration of resource
characteristics (room capacity, group size, equipment, etc.)
- Scheduling according
to priorities set by the user from among different types of constraints
(weighting of costs and load weights)
|